|
FacilityOne® is a valuable tool for anyone responsible for the maintenance and management of your facilities. FacilityOne® allows you to capture the knowledge and information concerning the facility systems that keep your facility operating – especially those critical to its operation. Call and ask us about FacilityOne®. It has a lot of people talking!
|
Performance and Power Evaluation |
- Evaluate the health of the physical infrastructure of your data center
- Identify areas of risk associated with the existing infrastructure
- Recommend actions to be taken to reduce risks and improve site availability
- Our recommendation is independent of the installed platform
- Prepares your site for future requirements Typically completed in 2 – 3 weeks
|
System Energy
Efficiency Studies |
- Investigate and analyze your data center power, cooling and space utilization
- Develop a solution that reduces power, cooling, and data center space requirements
- Consider capacities or constraints of your facilities
- Outline strategy to help achieve goals
- Typically completed in 2 – 3 weeks
|
Thermal Graphic Imaging |
- Optimize existing &/or future IT equipment layout
- All images will be gathered with a radiometric sensitivity no less than 0.2ºC and a resolution no less than 120x120 pixel quality.
- Digital imaging (Visible) of all equipment being thermally imaged at a resolution no less than 1.7 Mega pixels.
- All anomalies rating above intermediate will be digitally imaged at a resolution of 7 Mega pixels.
|